An official website of the San Andreas State Government πŸ”’ Secured
State-Certified Contractor Since 2003

Building roads.
Creating memories.
Stopping traffic.

FixerUP is the exclusive municipal contractor for Los Santos, Roxwood, and Blaine County. We don't just fix infrastructure β€” we maintain it as a lifestyle choice for over 847 active work zones across San Andreas.

847+ Active Zones
$2.3B State Funding
23 Years Running
πŸ›£οΈ
Road Work
Ongoing
πŸŒ‰
Bridges
Delayed
🚧
cones
Planning
⚠️
Detours
Active
⚠️
Service Advisory: Route 68 Bridge repair extended 14 months._detour remains in effect. Honking does not accelerate construction. Coffee shops along alternate routes report record sales.
Official Partners

Project Status Dashboard

Real-time overview of ongoing municipal infrastructure projects

β›”
127
Full Closures
↑ 12 this month
🚧
483
Active Work Zones
↑ 8 this week
πŸ“‹
214
Pending Projects
Est. completion 2035
βœ…
23
Completed (Ever)
πŸŽ‰ Milestone achieved
πŸ• Average Project Timeline
4.2
Years per Project
Industry standard: 6-9 months. We prefer quality relationships.

Municipal Services

Comprehensive infrastructure solutions tailored for San Andreas roadways since 2003

01
πŸ›£οΈ

Roadway Development

Comprehensive asphalt removal and semi-permanent gravel deployment. Specialized in creating high-vibration driving environments that keep driversalert and engaged.

  • Pothole Cultivation
  • Gravel Optimization
  • Steel Plate Installation
02
πŸŒ‰

Bridge Maintenance

Structural integrity assessment using our proprietary "Wait and See" methodology. Steel plate reinforcement available for all spans.

  • Structural Inspection
  • Lane Reduction
  • Weight Restrictions
03
πŸ”§

Utility Services

Subterranean exploration and inadvertent utility discovery. We find the pipes so you don't have to. Water main breaks are our specialty.

  • Emergency Excavation
  • Pipe Discovery
  • Traffic Disruption
04
🚦

Traffic Logistics

Strategic cone placement and detour optimization. Our work zones are designed for maximum visibility and psychological driver impact.

  • Cone Orchestration
  • Detour Design
  • Flagging Operations

Proprietary Technology

Award-winning solutions developed in-house

πŸ† Award Winning

StealthPlateβ„’ System

Our signature 2-inch thick steel plates are designed to be nearly indistinguishable from the road surface until impact, providing crucial suspension stress testing for every San Andreas motorist.

4,200+ Deployed
98% Driver Alerts
πŸ§ͺ Patented

FixerCreteβ„’ Hybrid

A revolutionary concrete-style substance that maintains a consistent state of "mostly dry" for up to 48 months, ensuring work zones remain vibrant landmarks for years.

48mo Drying Time
$2.1M Cost savings
πŸ”Š Patent Pending

Acoustic Pothole Detection

Leveraging sound-wave engineering, our potholes are tuned to alert drivers exactly 0.5 seconds before impact. Safety through audio surprise.

0.5s Warning Time
$847 Avg Alignment Cost

Worker Safety Protocol

Our crews follow strict guidelines to ensure maximum observation efficiency with minimum actual work output.

πŸ‘·

Observation-Only Work

Crews observe infrastructure issues from vehicles. Field work is performed by gravity and weather.

β˜•

Hydration Breaks

Mandatory coffee breaks every 45 minutes. Productivity would suffer without them.

πŸ“±

Communication

Phone usage is essential for coordinating delays with other crew members.

847 Days Without Incident
12% Time On Site
99% Cone Visibility

Active Projects

Flagship infrastructure improvements across San Andreas

LS-8802 Delayed

Vespucci Blvd Bridge "Restoration"

14-year bridge rehabilitation project. Originally scheduled 2012 completion. Currently in Phase 7 of 12 planned phases.

πŸ“ Vespucci, Los Santos Est. Completion: Q4 2028
BC-0347 In Progress

Route 68 Gravel Conversion

Transitioning asphalt to premium gravel surface. Extends commute times by average 23 minutes.

πŸ“ Grand Senora Desert Est. Completion: TBD
LS-9122 In Progress

Elysian Fields Pothole Cultivation

Strategic pothole development to improve driver attention and local auto mechanic economy.

πŸ“ Terminal, Los Santos Est. Completion: Ongoing
RX-4410 Planning

Mirror Park Speed Bump Installation

Community-requested traffic calming measures. Speed bumps spaced every 12 feet for optimal discomfort.

πŸ“ Mirror Park, Los Santos Est. Completion: 2030

Awards & Achievements

πŸ…

Least Efficient Contractor

San Andreas Infrastructure Committee

2021, 2022, 2023, 2024, 2025

πŸ₯ˆ

Longest Project Completion

State Municipal Association

Vespucci Bridge (14+ years)

πŸ₯‰

Most Steel Plates Per Capita

International Road Federation

Global Recognition

πŸŽ–οΈ

Orange High-Vis Vest Achievement

Safety Wear Council

Industry Leading

About FixerUP

Founded in 2003 by Gerald "Gerry" Montrose, FixerUP has evolved from a local asphalt patcher into a state-level infrastructure powerhouse.

We operate with a commitment to "Substantial Completion" β€” a philosophy that ensures every project remains a vital part of the local economy for years, if not decades. Our success metrics include project duration, budget utilization, and citizen complaints received.

23 Years of Service
847 Active Work Zones
$2.3B State Funding
"Infrastructure isn't a destination; it's a recurring billing cycle that stimulates local economies through extended commutes, increased fuel consumption, and perpetual orange cone visibility."
Gerald Montrose CEO & Founder

Executive Team

GM

Gerald Montrose

CEO & Founder

Former pothole filling assistant. 20+ years perfecting municipal bidding. Believes speed limits are suggestions.

DP

Donald "Donny" Plates

Head of Steel Deployment

Believes if a road doesn't have 4+ metal plates, it's not truly safe. Hasn't seen pavement in years.

LL

Linda Ledger

Chief Procurement Officer

Can find $50M for "incidental gravel" anywhere. The budget is more of a suggestion.

RW

Robert "Bob" Walters

Director of Detours

Master of the 45-minute detour. Has created over 2,000 "unforeseen conditions" since 2015.

Environmental Impact

FixerUP is committed to sustainable infrastructure practices

12,400 Tons CO2 From idling Cars in Detours
45% Shock Absorber Sales Increase
#1 Orange Paint Consumer Globally

News & Media

March 24, 2026

FixerUP Awarded "Least Efficient Contractor" for 5th Consecutive Year

The San Andreas Infrastructure Committee recognizes our commitment to maximum project duration.

Read More β†’
March 19, 2026

Global Gravel Shortage: Strategic Transition to "Coarse Sand"

CEO Gerald Montrose addresses upcoming sandy roadway transitions for all major freeways.

Read More β†’
February 28, 2026

Audit Report: $42M Spent on High-Visibility Vest Dry Cleaning

Maintaining the brightest orange gear in the industry is our priority.

Read More β†’
February 15, 2026

Vespucci Bridge Enters Year 14, Phase 7 of Planned 12 Phases

Bridge remains open but delayed. Steel plates now 3 inches deep on average.

Read More β†’

Public Comments

"I saw a guy sleeping in the truck. Not working. Just sleeping. Then he woke up, took a picture of a pothole, and left. This is art."

"My GPS recalculates 7 times during my 2-mile commute. I've seen places in Vinewood I didn't know existed. Thanks FixerUP."

"They put cones in a perfect circle around a hole that's been there since COVID. Nobody worked on it. It's a monument now."

"The construction truck was playing music SO loud at 6 AM I thought it was a festival. It was just one guy dancing. My alarm clock."

"I've named the potholes on my street. Gerald is the biggest one. Him and I have a relationship. I send him Christmas cards."

"The detour added 45 minutes to my 10-minute drive. I've now seen every yard in Sandy Shores. My wife thinks I'm having an affair."

"They closed ALL lanes. Not one left. The road just ends into a cone. People turn around and go home. The void consumes all."

"I counted 14 workers standing around ONE shovel. FOURTEEN. They formed a circle. It was like a cult. I don't drive there anymore."

"The steel plate launched my car into the air. I saw my whole life flash before my eyes. It was just a speed bump??"

"There's a guy who just stands there. Every morning. Same spot. Same position. Never moves. I think he's a scarecrow they forgot to remove."

"I drove through active construction at 3 AM and nobody was there. Just the cones. The cones were working harder than any human.Respect."

"The work zone is so long I've started a book club with fellow stranded motorists. We meet weekly. It's called 'Waiting for FixerUP'."

Citizen FAQ

Why is there only one worker for five trucks?

Efficiency through observation. Our "Observation Crew" ensures peak performance. This 5:1 ratio is industry-standard for government contracts.

How long will steel plates stay on my street?

Steel plates are semi-permanent upgrades. After 24 months, they're legally "Integrated Infrastructure" and removed from tracking.

Why is my street closed with no work?

Our "Psychological Readiness" program helps motorists adapt to eventual detours, reducing community stress during 8-year construction.

How do I report an infrastructure issue?

Call 1-800-FIX-ER-UP or visit our La Mesa headquarters. Average response time: 6-18 months. Urgent issues: 3-5 years.

Employment Opportunities

Build your career in municipal infrastructure excellence

Field Crew Supervisor (Mon-Thu Only)

Los Santos

Apply Now

Steel Plate Deployment Specialist

County-Wide

Apply Now

Compliance & Ethics Liaison (Contract)

Remote

Apply Now

Traffic Control Cone Technician

Various Locations

Apply Now

Vendor Portal

Join Our Supply Chain

Manufacture orange cones, "Road Closed" signs, or low-grade asphalt? We prioritize cost over quality.

Vendor Application

Procurement Ethics

Review our "Gift & Gratuity Acceptance Policy" for executive retreats.

View Policy

Contact Us

Ready to report an infrastructure issue? We may get to it eventually.

πŸ“ž

Phone

1-800-FIX-ER-UP

πŸ“§
πŸ“

Headquarters

La Mesa, Los Santos

πŸ•

Hours

M-F 9am-4pm (when we're in)